Add to Favorites | Chinese
China in limited company of electrified wire netting grooms central water harbou
From;    Author:Stand originally
Project name: China in limited company of electrified wire netting grooms central water harbour can system of central air conditioning transforms project place to belong to sort: Place of information of invite public bidding belongs to an area: Hubei omits issue date: 2007-1-15 16:40:5Content of announcement of 1:

China in limited company of electrified wire netting grooms central water harbour can system of central air conditioning transforms person of project invite public bidding to be China in electric power develops a company. Source of financing of this project project is prepared oneself by person of invite public bidding. Limited company of invite public bidding of Hubei Feng Hua suffers person of invite public bidding to entrust, with respect to this project project (number: FHZB2007-001) undertake home makes public invite public bidding, the domestic bidder that accepts qualification is referred sealed bid.
1.1 equipment brief introduction
1.1.1 China in limited company of electrified wire netting grooms the unit of York cold water that configuration of central refrigeration computer room has refrigerating capacity to be 250RT two. China in limited company of electrified wire netting grooms cold bear of peak value of 100% designs day is the center about 175RT, electric power trough period use to be able to satisfy a requirement, unit of a refrigeration is in unused condition.
1.1.2 original the boiler of electric heat water of a 950kw is contented groom the thermic load requirement of central winter heating; Classics check before boiler runs a record, when weather is the coldest, the biggest thermic load is 400kw left and right sides; Primary system did not establish facility of board type heat exchange, pump discharge of systematic heating loop is 173m3/h, lift: 38 meters, power: 37kw, use one equipment.
1.1.3 original the hot water boiler of a 420kw, contented groom demand of central sanitation hot water, primary system is used offer form continuously; Pump discharge of water supply of former life hot water is 25m3/h, lift: 50 meters, power: 7.5kw, use one equipment. Hot water of life of 54 guest room is building of former student dormitory electric water heater is supplied, plan to transform for groom boiler of report of building computer room and system of accumulation of heat are supplied.

Limits of 1.2 invite public bidding
1.2.1 water harbour is cold system of central air conditioning transforms system of accumulation of heat of heating of boiler of design and construction, report to transform system of accumulation of heat of hot water of design and construction, life to transform design and construction (the life warm water system that includes guest room of building of former student dormitory transforms design and construction) .
Previous12 Next